2,000 m² Ankara-İzmir High-Speed Train Project Site Mobilization

Project Type: Site Mobilization
Project Size:
Location: –
Completion Time: –

Alyans Prefabrik’s integrated solutions were chosen to keep field operations running without interruption on the Ankara – İzmir High-Speed Train (YHT) project, one of the largest investments in Türkiye’s transportation infrastructure. At the project’s two strategic logistics hubs, the Ankara / Polatlı construction site and the Sivrihisar construction site, industrial prefabricated and container camp buildings were built with advanced engineering discipline to meet the accommodation and social needs of personnel.

 

Taking into account the open terrain, varied geography and harsh climate conditions of railway and infrastructure projects, high-density thermal insulation systems were used in the exterior wall and roof panels of all modular building blocks. The prefabricated and container components produced on our advanced factory production lines were installed according to a site layout that allows the office, dining hall and rest areas on the construction sites to work together seamlessly. Saving significant time compared with conventional construction methods, Alyans Prefabrik fully delivered this strategic project within the committed contractual schedule.

Project Gallery

◉WhatsApp