Our 7000 m² Prefabricated Dog Shelter Project

Project Type: Prefabricated Light Steel
Location: Isparta
Project Size: 7000 m2
Project Year: 2018
Completion Time: 90 Days

Alyans Prefabrik has completed a massive project. The total completion time, from production to installation, was 90 days. Large-scale projects require both speed and high-quality construction. Our 7,000 m2 prefabricated dog shelter project in Isparta was produced both quickly and to a high standard. In just 90 days, we produced a carefully planned, high-quality facility for our client.

The Alyans Prefabrik expert team efficiently managed the entire process, from design to production, and installed the structure smoothly on the plot our client requested. As a result, the process was completed as planned, without any delays. Completing such a large 7,000 m2 area in such a short time shows how meticulously we work at Alyans Prefabrik.

The materials used are durable and high quality, and the design is highly functional. Alongside fast production, structural soundness was a top priority, and the design aims for safe use over many years. With this in mind, the most durable, long-lasting shelter was designed for the dogs. This project is proof of Alyans Prefabrik’s advanced technical expertise and experience. Producing a 7,000-square-meter facility in just 90 days and installing it ready for use shows how well organized we are. If you would like to purchase one of these buildings, call our sales representatives today.

Project Gallery

◉WhatsApp